2026

9.15.26 Board members Bob and Rich spent a rather chilly, windy day on the tower continuing work on the fence replacement project. With all the stair sections completed, we started with the first landing section. As with all tower projects there is a learning curve. At the end of our workday, we completed replacing the fence on the first landing and believe it will serve the purpose well.
We had a few interesting visitors. One group in particular were 3 guys near the end of a week-long paddle trip that started at Long Lake!

8.12.26 Board members Doug, Bob and Rich, along with friend Steve, worked on replacing the top, and last, railing fence. The top railings are different than the lower levels, therefore requiring measuring, cutting and planning the steps. The previous sections of fence were precut on day one of fence replacing as they were all the same size. Again, the final outcome looks great! There is some fine tuning to do, but only we will notice it!!

Now – onto the fencing on the landings.

Doug and Bob

Steve

8.5.26 Bob and Rich again went to the tower by way of the lake trail. It’s a mile shorter and that counts when hauling tools!

We managed to complete the railing fence replacement for the 4th floor. On the top level, the fencing is a bit shorter. That means re-creating a new template before installation.

When the fifth level is done, we start working on the landings.

We had lots of visitors from the lake who also hiked the lake trail; several folks in a few different groups from the Rochester area, and this wonderful couple from near-by Hoel Pond! She has wonderful stories of hiking the tower with her grandfather.

 

7.20.26 Board members Bob and Rich and canine assistant Bonnie went back to work on the fence project. They completed the third flight, installing fence on both sides. This involves putting the pre-cut (though requiring additional adjustments) fence in place and attaching (drilling for bolts) aluminum strips on the vertical railing posts and on the handrail. These strips cover and hold in place the sharp ends of the fence to protect your hands when holding the railing.

Steward Shannon was on duty today. She visited with many guests and helped out when free. Thank you, Shannon,

There are now 2 more flights and 4 landings to replacement fence on.

 

7.17.26 Board members Bob and Rich, and new tower worker friend Sandy spent the day continuing work on the fence replacement project. We hiked via the lake trail, our preferred route when carrying tools. The weather was perfect. After assembling the tools and fencing, we got to work. The bottom line is that what we thought would go fairly fast is anything but. Even though fencing and aluminum flat bars were precut, there is still quite a bit of finagling and some fence cutting to get everything in the correct position before drilling holes and bolting everything down tight. Though not as much was accomplished as hoped, the final product is very nice.

We have the fence on the bottom 2 flights of stairs replaced. That leaves 3 more flights (2 railing sides, of course) and all 4 landings.

If you are able and willingly to help with this project to insure it is finished this season, please email us at friendsofstregis@gmail.com

6.2026 A couple of years ago the Friends group acquired a museum quality display case from Adirondack Experience, The Museum on Blue Mountain Lake. Volunteers renovated the case and placed it in the Main Room of the Paul Smith’s College Visitor Interpretive Center (VIC). Inside the case are historic artifacts and memorabilia used by Observers on St. Regis Mountain and other fire towers. Rounding out the display are posters, replica panoramic panels, a trail sign and the original map table. All of this is an ever changing “work in progress.”

The Paul Smith’s College VIC is a strong partner with the Friends of St. Regis Mountain Fire Tower. Stop by the VIC to check out the display and the view of Heron Marsh with the fire tower in the background. While you are there, pick up a free 2” St. Regis sticker or purchase larger stickers, hats and patches in the VIC store, proceeds benefit both organizations.

During your visit to the VIC give yourself some time to take a walk or a hike on one of their beautiful trails. You’ll be glad you did.

Your support helped make this display a reality.

 

2025

9.2025 Several members of the Friends of St Regis Mountain Firetower spent 2 days working on the fencing replacement project. Good progress was made, mostly in terms of cutting out most of the larger parts of the new fence so that in 2026 they will be easier to put in place. We also improved on the old fence so that it is safer and will hopefully serve hikers well in the winter months.

Now that we are here in Spring of 2026, we sill soon be working on replacing all the fencing.

2024

9.18.24 Board members Doug, Bob and Rich mounted another panoramic panel in the tower cab. Visitors to the tower can use the labels on the panels to identify the features they are viewing. The new north view panel is the fourth one to be installed. The south and east views were placed three years ago and the west view was put up last month. The two new panels are professionally crafted and are expected to last ten or more years in the harsh summit environment. Next year the original two panels will be replaced with new professionally manufactured plates.

The heavy panels and all the tools needed to install them are packed to the top of the mountain by the volunteers. Precise marking and drilling are required to secure the panels to the tower. Using the proper safety equipment, one person works outside of the cab while two others work inside. The work is challenging and physically demanding, but extremely rewarding.

Panel photos by Mark Kurtz Photography.

8.27.24 Board members Jack B and Rich were on the summit yesterday to install another panoramic panel showing and naming the mountains and water seen in that view shed. We hiked up the lake trail (thank you Karen for the use of your boat). There are several large trees down and several areas with significant water on that section of trail. The main trail was mostly dry.

The installation – as with most jobs on the mountain – had its low moments and very high moments. No matter how much you plan a project, once up there you realize the job isn’t as easy as imagined. However – the job always gets accomplished! This time a wonderful Smitty student in the name of Matt appeared and helped finish the job in quick fashion.

We also had several very nice hikers visit us.

There was a couple from Italy traveling the States on their honeymoon!!  And brought their love to our tower!

Tabby, a USR lake resident, is a frequent visitor. Later on Tabby sent a very nice text: “thank you for all the hard work you have put into bringing the tower back to life. I know you’ve given everyone on the lake a little piece of their childhood soul back. We all cherish the tower”.

7.8.24 On 7/8/24 3 members of The Friends of St Regis Mt Firetower packed up lots of tools to continue the fence replacement project, move the flag bracket, and talk with all the wonderful visitors at the tower.

6.15.24 On Saturday, four volunteers carried heavy loads up the mountain to begin a project to replace the safety fencing. The narrow stairs and landings are full of angles, twists and turns all surrounded by the supporting structure of the tower, with only the rock at the base of the tower for a work area. Thus, progress is never as fast as we would like it to be. We got a good start on the project and will return soon to continue the work. In the meantime, as the saying goes “please pardon our dust.”

2023

10.24.23 Board members Doug, Bob and Jack B. hiked to the tower on this nice fall day. The hike up was very pleasant and warm. Once on the summit the cool wind required they wear the puffy jackets they packed up! Their mission was primarily to make a template for an aluminum bar that will be used for securing the new fence, as well as to take other measurements. They can now pre-drill other bars so that when the project occurs next spring there will be less drilling required at the tower.

They also did some end-of-summer chores so we are all ready for the winter hiking season!

8.12.23 As our mission statement says, The Friends of St. Regis Mountain Fire Tower is intent on restoring the tower as well as developing an educational and interpretive program. To that end the Friends and the Paul Smith’s College VIC have partnered to produce a display about the fire tower.

Check it out in the Great Room at the VIC.

7.14.23 On Friday board member Rich installed the bracket and arranged with Summit Steward Ethan the flying of our flag on days that he is there. It is truly a beautiful site and can be seen – with binoculars – from many places around our region. Take a hike Friday, Saturday or Sunday when Ethan is there and enjoy it up close and personal!

4.22.23 Board members Doug and Tom and friend John hiked up St. Regis to do a little maintenance and to plan for up coming projects.

Tom and Doug tightened a few bolts and painted over a little graffiti, then took a bunch of measurements for the up coming safety fence replacement project.

John joined us for the hike and served as ground control. We had the summit to ourselves for over two hours. Only saw one other person on the trail.

2022

8.19.22 Board members Bob, Tom and Rich took measurements and started the brainstorming sessions to plan a new fence for the firetower. It was a very productive first round. We are certainly open to all suggestions.

We and mountain steward Tony interacted with many visitors, including a couple of guys with inflatable lounge chairs! This was a first.

It was a beautiful day to be on St Regis mountain. There is some blow down on the trail of large trees, but nothing that causes one to hike off the trail.

6.20.22 Board members Bob and Rich had a very productive day of painting and had many visitors throughout the day. They finished up the more difficult parts and have only a couple spots to paint reachable without special tools or safety equipment!

They hiked up via the lake trail with friend Mary. The trail has a fair amount of blow down to maneuver over, but it is certainly manageable. There is on section of maybe 50 feet that is very wet. Again – very doable.

 

5.23.22 Board members Rich and Bob spent another beautiful day painting the tower. Bob mastered the roller technique and made tremendous progress. Rich worked the “outer limits” which requires moving planks around and careful footing! In the picture you can see what has not been painted and requires said planks and meticulous maneuvering. At this rate we should have only a few more days to completion of the painting project!

We had a few visitors, but unfortunately no pictures. The black flies and mosquitoes may have limited the number of hikers. Go early, be prepared with bug dope and/or netting, and climb the tower. One flight up and there were no bugs (thank goodness)!

 

5.9.22 Day 1 of painting for the 2022 season! And what a beautiful day it was. Friends of St Regis Mountain Firetower Tom and Rich continued the painting project started last year. Today we painted some of the tower legs. FYI – we are in need of volunteers for this painting project so that it can be wrapped up this year.

During the work day we had several visitors: a wonderful couple from Rochester celebrating 7 years of marriage; a group of tower enthusiasts from Clarkson University; and two DEC employees with chainsaws (THANK YOU for clearing the fallen trees off the trail)!

The trail was quite dry, and is in much better shape now; be prepared to battle black flies.

2021

This year’s major projects were fabricating & installing the labeled panoramic panels in the cab, and painting the tower.

The two photos used in the panels were taken by local photographer Mark Kurtz. They show the east and south views as seen from the cab. The mountains and water bodies in the pictures are labeled so visitors can easily identify what they are seeing. The panels were fabricated by board member Jack and volunteer Jay. On September 2 board members Jack, Doug and Rich along with Jay paddled across the Upper St Regis Lake to the lake trailhead, carried the panels to the summit (taking turns!), and installed them onto the ceiling using brackets fabricated by friend Earl.

Throughout the summer, board members Rich, Doug, and Bob, and volunteer Tom worked on the tower painting project. Thus far the majority of the stringers and railings have been painted. This has proven to be a very involved process. The fencing needs to be removed, therefore painting the stringers is cumbersome and slow; we are painting all surfaces of the railings. Then the fencing needs to be put back with galvanized wire. After 8 days of painting throughout the summer, there is hopefully only one day left to finish the stringer/railing portion of the project. Next year we will paint the legs, horizontal cross braces and possibly re-paint the inside and outside of the cab. The diagonal braces were new in May 2019 and still look good. Painting the braces and legs will involve laying planks across the horizonal braces so the painter – with a safety harness on – can access the legs away from the landings. All the way to the top! We will also look at “if and when” the roof will require painting.

2020

Due to COVID-19, the tower was closed from late March to June 26,2020. Hiking the trail was allowed, but no one was allowed in the tower – hikers or workers. Once the tower opened, FOSRMFT didn’t want to then close the tower to do the needed work. Therefore, it wasn’t until late August and into September when restoration work commenced.

9.16.20 On Wednesday board members Bob and Rich finished two projects: spraying cold galvanization on drilled parts of the window frames, and priming the metal under the pressure treated boards. The floor of the cab was the final section to prime. Thanks to all the visitors who wished us well and were patient with the tower being closed during their visit.

8.19.20 On Wednesday board member Rich worked on galvanizing the previously drilled holes in the window frames. He also cleaned out the 1 footer which was full of water, as well as covered up a couple incidents of graffiti. Rich visited with a few hardy souls who ventured up to the cab on this windy, chilly day. Many more hikers had picnics on the summit. One fellow brought his ham radio equipment with him!

2019

10.11.19 Board members Bob and Rich had another very successful workday yesterday – complete with perfect weather and many wonderful visitors. They painted the metal of the final landing (all stairs and landings are now completed) and galvanized the drilled holes in the windows on 2 sides of the cab. The cab floor and other 2 sides of window frames still need painting.

10.4.19 Doug, Rich and John again went by way of boat and the lake trail (it’s a shorter hike and we are carrying heavy packs with tools,…). It was a cold ride over, and a chilly day of work. In spite of the weather, we accomplished a lot and had some visitors. We primed the metal under 2 landings. The leg brackets were full of debris and sediment which was causing them to hold water. This could cause damage during freezing and thawing. They were cleaned out and drainage was re-established.

9.17.19 Bob and Rich boated over to the Judy Cameron (lake) Trail. The first half of the ride was through very heavy fog; then, the mountain and tower came into view. We managed to finish priming the stairs and one 2-board landing (no work pictures today).

8.27.19 Several days later, Bob and Rich hiked back up to do more work on priming the stairs. Previously we found that removing the nylon nuts was not always easy. Several bolts had been stripped so we had to cut them with a hacksaw. Only 5 stairs were actually completed on 8/19. This day proved a little less frustrating, but still presented challenges. By the end of the day, we had finished 3 flights of stairs – leaving 2 flights and the landings yet to be primed. Again today we had many visiting hikers, and handed many stickers and hiking certificates. One hiker of note was Annika, the granddaughter of Judy Cameron (for whom the lake trail is named), and her cousin Tabby. These women shared stories of climbing the tower and visiting the observer “with the waxed moustache”! This observer was no doubt Ed Samburgh.

8.19.19 Mason Mike Stender repairs footings.
Mike, friends Jay, John and board members Doug, Rich, Jack and Bob (with all necessary materials) rode boats to the Lake Trail in Spring Bay, Upper St. Regis Lake.
The hike up the Lake Trail was uneventful. At the merge with the Keese Mills Trail, we stopped to fill up several gallon jugs with water to mix with cement for the footings repair. The hike from there to the summit was good, though with a heavier load. Once at the top, the weather was OK and Mike got right to work. Other workers started a stair priming project. The stairs need to be removed and the metal stringers primed to avoid rusting.
Soon after starting, the weather turned sour rather quickly. Work paused for a little so the crew ate lunch. When the rain let up, it was back to work.
After a group picture, the crew packed up to head down the mountain. Throughout the work day, several hikers also braved the weather to enjoy the sights of the summit of St Regis Mountain.

5.22.19  All the cross braces on the fire tower have been replaced. The tools and equipment used for the project, plus the old braces are now off the mountain.
The DEC Rangers and Foresters and the State Police Pilots are vital to the restoration projects being carried out on the fire tower.

5.20.19  On May 20 Ranger Burns was on the summit strapping the braces together in preparation for their flight out. Some Northwood School students arrived – working on their Saranac Lake 6er. Their help with the banding process was much appreciated by Ranger Burns and the Friends of St. Regis Mountain Fire Tower. Thank you!!!

5.11.19 Trail Report from 5/11 and brace installation completed 5/12. On 5/11 FOSRMFT member Doug hiked up to join Mike and his crew of 3 to work more on installing the braces. Doug reported that the trail was much wetter and muddier than just a couple days before. The 5 worked nearly into the night and finished all but 2 of the 4 sections on the top. Mike and a helper went back Sunday, again worked dawn to dusk, to complete the project. The St Regis Mountain Fire Tower now has all new braces!!!

5.8.19 Trail report and Restoration update: Wednesday 5.8.19 was a perfect day to hike St Regis and start up the restoration work for this year. First – NO BUGS! As of yesterday… The trail is in great shape except for several smallish sections of mud. Please do your best to stay on the trail; the wet sections are generally not all that deep or bad to walk right though.
Restoration started up again in earnest. The construction crew of 3 and 3 FOSRMFT members worked at replacing the cross braces. The 8 braces on the ground level were completed. The crew will be at it again in a few days and the project is expected to be completed within a week.

5.5.19 On Tuesday, May 7, 2019 restoration work will commence on the St. Regis Mountain Fire Tower. It is expected that the work will be periodic and completed in about ten days. While actual work is taking place the tower will be temporarily closed to climbing. When no work is taking place and once the current project is complete the tower will be open. Thank you for your patience.