2022

8.19.22 Board members Bob, Tom and Rich took measurements and started the brainstorming sessions to plan a new fence for the firetower. It was a very productive first round. We are certainly open to all suggestions.

We and mountain steward Tony interacted with many visitors, including a couple of guys with inflatable lounge chairs! This was a first.

It was a beautiful day to be on St Regis mountain. There is some blow down on the trail of large trees, but nothing that causes one to hike off the trail.

6.20.22 Board members Bob and Rich had a very productive day of painting and had many visitors throughout the day. They finished up the more difficult parts and have only a couple spots to paint reachable without special tools or safety equipment!

They hiked up via the lake trail with friend Mary. The trail has a fair amount of blow down to maneuver over, but it is certainly manageable. There is on section of maybe 50 feet that is very wet. Again – very doable.

 

5.23.22
Board members Rich and Bob spent another beautiful day painting the tower. Bob mastered the roller technique and made tremendous progress. Rich worked the “outer limits” which requires moving planks around and careful footing! In the picture you can see what has not been painted and requires said planks and meticulous maneuvering. At this rate we should have only a few more days to completion of the painting project!
We had a few visitors, but unfortunately no pictures. The black flies and mosquitoes may have limited the number of hikers. Go early, be prepared with bug dope and/or netting, and climb the tower. One flight up and there were no bugs (thank goodness)!

 

5.9.22 Day 1 of painting for the 2022 season! And what a beautiful day it was. Friends of St Regis Mountain Firetower Tom and Rich continued the painting project started last year. Today we painted some of the tower legs. FYI – we are in need of volunteers for this painting project so that it can be wrapped up this year.

During the work day we had several visitors: a wonderful couple from Rochester celebrating 7 years of marriage; a group of tower enthusiasts from Clarkson University; and two DEC employees with chainsaws (THANK YOU for clearing the fallen trees off the trail)!

The trail was quite dry, and is in much better shape now; be prepared to battle black flies.

2021

This year’s major projects were fabricating & installing the labeled panoramic panels in the cab, and painting the tower.

9.2.21 The two photos used in the panels were taken by local photographer Mark Kurtz. They show the east and south views as seen from the cab. The mountains and water bodies in the pictures are labeled so visitors can easily identify what they are seeing. The panels were fabricated by board member Jack and volunteer Jay. On September 2 board members Jack, Doug and Rich along with Jay paddled across the Upper St Regis Lake to the lake trailhead, carried the panels to the summit (taking turns!), and installed them onto the ceiling using brackets fabricated by friend Earl.

Throughout the summer, board members Rich, Doug, and Bob, and volunteer Tom worked on the tower painting project. Thus far the majority of the stringers and railings have been painted. This has proven to be a very involved process. The fencing needs to be removed, therefore painting the stringers is cumbersome and slow; we are painting all surfaces of the railings. Then the fencing needs to be put back with galvanized wire. After 8 days of painting throughout the summer, there is hopefully only one day left to finish the stringer/railing portion of the project. Next year we will paint the legs, horizontal cross braces and possibly re-paint the inside and outside of the cab. The diagonal braces were new in May 2019 and still look good. Painting the braces and legs will involve laying planks across the horizonal braces so the painter – with a safety harness on – can access the legs away from the landings. All the way to the top! We will also look at “if and when” the roof will require painting.

2020

Due to COVID-19, the tower was closed from late March to June 26,2020. Hiking the trail was allowed, but no one was allowed in the tower – hikers or workers. Once the tower opened, FOSRMFT didn’t want to then close the tower to do the needed work. Therefore, it wasn’t until late August and into September when restoration work commenced.

9.16.20 On Wednesday board members Bob and Rich finished two projects: spraying cold galvanization on drilled parts of the window frames, and priming the metal under the pressure treated boards. The floor of the cab was the final section to prime. Thanks to all the visitors who wished us well and were patient with the tower being closed during their visit.

8.19.20 On Wednesday board member Rich worked on galvanizing the previously drilled holes in the window frames. He also cleaned out the 1 footer which was full of water, as well as covered up a couple incidents of graffiti. Rich visited with a few hardy souls who ventured up to the cab on this windy, chilly day. Many more hikers had picnics on the summit. One fellow brought his ham radio equipment with him!

 

2019

10.11.19 Board members Bob and Rich had another very successful workday yesterday – complete with perfect weather and many wonderful visitors. They painted the metal of the final landing (all stairs and landings are now completed) and galvanized the drilled holes in the windows on 2 sides of the cab. The cab floor and other 2 sides of window frames still need painting.

 

10.4.19 Doug, Rich and John again went by way of boat and the lake trail (it’s a shorter hike and we are carrying heavy packs with tools,…). It was a cold ride over, and a chilly day of work. In spite of the weather, we accomplished a lot and had some visitors. We primed the metal under 2 landings. The leg brackets were full of debris and sediment which was causing them to hold water. This could cause damage during freezing and thawing. They were cleaned out and drainage was re-established.

9.17.19 Bob and Rich boated over to the Judy Cameron (lake) Trail. The first half of the ride was through very heavy fog; then, the mountain and tower came into view. We managed to finish priming the stairs and one 2-board landing (no work pictures today).

 

8.27.19 Several days later, Bob and Rich hiked back up to do more work on priming the stairs. Previously we found that removing the nylon nuts was not always easy. Several bolts had been stripped so we had to cut them with a hacksaw. Only 5 stairs were actually completed on 8/19. This day proved a little less frustrating, but still presented challenges. By the end of the day, we had finished 3 flights of stairs – leaving 2 flights and the landings yet to be primed. Again today we had many visiting hikers, and handed many stickers and hiking certificates. One hiker of note was Annika, the granddaughter of Judy Cameron (for whom the lake trail is named), and her cousin Tabby. These women shared stories of climbing the tower and visiting the observer “with the waxed moustache”! This observer was no doubt Ed Samburgh.

 

8.19.19 Mason Mike Stender repairs footings.
Mike, friends Jay, John and board members Doug, Rich, Jack and Bob (with all necessary materials) rode boats to the Lake Trail in Spring Bay, Upper St. Regis Lake.
The hike up the Lake Trail was uneventful. At the merge with the Keese Mills Trail, we stopped to fill up several gallon jugs with water to mix with cement for the footings repair. The hike from there to the summit was good, though with a heavier load. Once at the top, the weather was OK and Mike got right to work. Other workers started a stair priming project. The stairs need to be removed and the metal stringers primed to avoid rusting.
Soon after starting, the weather turned sour rather quickly. Work paused for a little so the crew ate lunch. When the rain let up, it was back to work.
After a group picture, the crew packed up to head down the mountain. Throughout the work day, several hikers also braved the weather to enjoy the sights of the summit of St Regis Mountain.

5.22.19  All the cross braces on the fire tower have been replaced. The tools and equipment used for the project, plus the old braces are now off the mountain.
The DEC Rangers and Foresters and the State Police Pilots are vital to the restoration projects being carried out on the fire tower.

 

5.20.19 Ranger Burns was on the summit strapping the braces together in preparation for their flight out. Some Northwood School students arrived – working on their Saranac Lake 6er. Their help with the banding process was much appreciated by Ranger Burns and the Friends of St. Regis Mountain Fire Tower. Thank you!!!

5.11.19 Trail Report from 5/11 and brace installation completed 5/12. On 5/11 FOSRMFT member Doug hiked up to join Mike and his crew of 3 to work more on installing the braces. Doug reported that the trail was much wetter and muddier than just a couple days before. The 5 worked nearly into the night and finished all but 2 of the 4 sections on the top. Mike and a helper went back Sunday, again worked dawn to dusk, to complete the project. The St Regis Mountain Fire Tower now has all new braces!!!

5.8.19 Trail report and Restoration update: Wednesday 5.8.19 was a perfect day to hike St Regis and start up the restoration work for this year. First – NO BUGS! As of yesterday… The trail is in great shape except for several smallish sections of mud. Please do your best to stay on the trail; the wet sections are generally not all that deep or bad to walk right though.
Restoration started up again in earnest. The construction crew of 3 and 3 FOSRMFT members worked at replacing the cross braces. The 8 braces on the ground level were completed. The crew will be at it again in a few days and the project is expected to be completed within a week.

5.5.19 On Tuesday, May 7, 2019 restoration work will commence on the St. Regis Mountain Fire Tower. It is expected that the work will be periodic and completed in about ten days. While actual work is taking place the tower will be temporarily closed to climbing. When no work is taking place and once the current project is complete the tower will be open. Thank you for your patience.